Project Overview
Wastewater Treatment Improvement at Protein Facility
This project was a Wastewater Treatment Improvement Project for a Protein Facility. The new structures UCI built/placed concrete for include:
- Anoxic/Aeration Basin
- Final Clarifier
- Tertiary Clarifier
- Sludge Holding Tank
- Biogas Flare Structure
- Tertiary Building
Total cubic yards of concrete placed by UCI is 3,500cy’s. UCI also installed various equipment which included:
- 3 Clarifier Mechanisms (1 new structure and 2 existing structures where UCI removed the old equipment and then installed the new equipment)
- 1 Tertiary Clarifier
- 1 Belt Filter Press, relocated existing Belt Filter Press
- Biogas Blowers
- Screw Conveyor
- Submersible Mixers
- Various Pumps and Skids
- Wier Gates