Project Overview
Chemical Plant Construction Expansion
This project was a fast track industrial project with extremely high barriers to entry with regard to safety and performance qualifications. UCI was able to complete the foundations package for the project ahead of the building schedules, and was recognized for its professionalism by the project owner and asked to perform additional work on the project.
This project was particularly challenging due to the nature of the contract, which was set up as an Engineer-Procure-Construct, but due to the fast track nature was more like a design-build project. UCI was able to continually hit targets even as designs changed due to its Predictable Performanceâ„¢ production management processes.