Project Overview

RNG Facility at Large Dairy Farm #3

UCI was onboarded in 2022 to begin pre-construction and constructability support for a third dairy manure to RNG facility for a repeat client.  Our team focused on capturing lessons learned and value engineering ideas from the previous two project to generate value for our client.  Through multiple teamwork-shops and reviews, our helped reduce the overall project construction cost by 10% in a historically volatile market.  In addition to reducing cost, the UCI team is tracking to reduce schedule by nearly 20% vs previous projects.  This project includes the following:

  • -2 250’ X150’ radius end digestors

  • Manure preheating

  • Manure heating building

  • Full Gas upgrading process

  • H2S removal system

  • PDC building

  • Modular operations building

  • Scope included all Structural, Mechanical, Electrical, and Instrumentation